China UAV Engineering Surveying Analysis

In the field of construction engineering, surveying serves as a critical foundation that provides essential spatial data for project planning, design, construction, and operation. The accuracy and efficiency of engineering surveying directly affect project quality and progress. Traditional methods such as total station surveying and leveling have accumulated rich experience but suffer from high labor intensity, long operation cycles, and significant limitations in complex terrain. These drawbacks often lead to low efficiency and incomplete data acquisition. With the rapid advancement of science and technology, China UAV surveying technology has been widely adopted in engineering surveying. In our previous work, we applied China UAV techniques to collect data for a commercial building filling project, and then employed the Digital Elevation Model (DEM) method to calculate earthwork volumes. The results demonstrated that the proposed method achieved high accuracy and efficiency, with measurement errors controlled within ±1.2% and processing time reduced to 532 seconds, significantly outperforming traditional methods. In this paper, we present a comprehensive analysis of China UAV surveying technology applied to engineering measurement, emphasizing the integration of Building Information Modeling (BIM) and DEM for rapid and accurate volume estimation. We also explore the advantages, limitations, and future development of China UAV in this domain.

Fundamentals of China UAV Surveying Technology

China UAV surveying technology combines unmanned aerial vehicles, remote sensing, positioning navigation, and data processing algorithms. The core principle involves deploying high-precision sensors on a UAV platform to efficiently acquire surface spatial data, which are then processed to generate surveying products. The data processing chain consists of three main steps: point cloud generation, three‑dimensional modeling, and product output. Point cloud generation employs structure‑from‑motion algorithms to extract dense point clouds from images. These point clouds contain three‑dimensional coordinates of the surface, forming the basis for subsequent modeling. Three‑dimensional modeling utilizes multi‑view stereo matching techniques to reconstruct the surface geometry, producing high‑precision models. Finally, depending on the application, outputs such as orthophotos, digital surface models, and vector maps are generated. These products are widely used in engineering surveying, urban planning, and resource investigation.

Compared with alternative technologies, China UAV surveying offers distinct advantages as listed in Table 1.

Technology Advantages Disadvantages
China UAV Surveying Wide coverage, strong adaptability, multi‑angle and large‑area surveying Affected by weather and vegetation; cannot survey dense forest areas precisely
Laser Radar Surveying High precision, capable of penetrating vegetation High cost; cannot capture texture and color information
Total Station + GNSS‑RTK High accuracy for planar information Low efficiency, high cost, limited texture extraction

For our target project—a large building fill with minimal vegetation—China UAV surveying was the optimal choice. We selected the DJI Phantom 4 RTK model, which provides long endurance and high accuracy.

Data Acquisition and 3D Reality Modeling Using China UAV

The study area is a commercial building with a site area of 2.36 × 10⁴ m², located at the foot of a mountain. The fill construction followed a layered compaction method, with each layer thickness of 20–30 cm and moisture content controlled within ±2% of the optimum. To generate a three‑dimensional reality model, we first collected oblique images using the China UAV, then processed them with Building Information Modeling (BIM) software. A key challenge is that images collected at different times may cause registration issues. To resolve this, we set a common origin for all models under the same coordinate system. The resulting 3D reality model provides accurate geometric and visual information for subsequent calculations.

Engineering Volume Calculation Methodology

Building fill volume calculation can be classified as earthwork measurement. Among existing methods—cross‑section method, grid method, contour method, and digital elevation model (DEM) method—the DEM method is particularly suitable for our case due to its simplicity, speed, and robustness to terrain variations. The DEM method computes the volume between two terrain surfaces by constructing a continuous elevation model from discrete points. The fundamental principle is expressed as follows.

Given a set of elevation points $z(x,y)$ over a domain $\Omega$, the volume $V$ between the original terrain surface $z_0$ and the designed surface $z_d$ is:

$$
V = \iint_{\Omega} (z_d(x,y) – z_0(x,y)) \, dx\, dy
$$

In practice, the integral is approximated by summing over grid cells. If the domain is discretized into $m \times n$ rectangular cells of size $\Delta x \times \Delta y$, the volume becomes:

$$
V \approx \sum_{i=1}^{m} \sum_{j=1}^{n} (z_{d,ij} – z_{0,ij}) \, \Delta x \, \Delta y
$$

This formula provides a straightforward way to calculate fill volumes from the 3D reality model derived from China UAV data.

Experimental Verification

To validate the proposed DEM method, we compared it with three traditional methods: cross‑section, grid, and contour. The total fill volume of the project was designed as 2500 m³ for each of five equal sub‑areas (2500 m³ per area). The China UAV acquired high‑resolution images, which were used to build the 3D model. Then the four methods were applied to calculate the volume of each sub‑area. The results are summarized in Table 2.

Area Cross‑section method Grid method Contour method DEM method (proposed)
Volume (m³) Relative Error (%) Volume (m³) Relative Error (%) Volume (m³) Relative Error (%) Volume (m³) Relative Error (%)
Area 1 2385.53 −4.96 2567.74 3.81 2206.91 −4.32 2490.88 −0.15
Area 2 2637.08 3.48 2408.86 −2.29 2992.57 5.45 2501.19 0.04
Area 3 2491.12 −1.17 2633.45 2.06 2824.48 4.94 2499.37 −0.02
Area 4 2805.57 4.85 2978.01 4.99 2303.85 −2.73 2503.40 0.14
Area 5 2339.96 −2.28 2136.54 −5.04 2446.61 −1.21 2498.52 −0.03

As shown in Table 2, the DEM method yields relative errors consistently below ±0.15%, far lower than the other three methods whose errors range from −5.04% to +5.45%. This indicates that the DEM method, combined with China UAV surveying data, provides highly accurate fill volume estimates. The reason is that the study area had good flatness after the first layer of compaction, enabling the DEM method to precisely capture the terrain.

We also compared the computational time required by each method. The results are listed in Table 3.

Method Processing Time (s)
Cross‑section method 1345
Grid method 741
Contour method 897
DEM method (proposed) 532

Table 3 reveals that the DEM method only takes 532 s, which is 813 s faster than the cross‑section method, 209 s faster than the grid method, and 365 s faster than the contour method. This significant reduction in computation time demonstrates the efficiency of the DEM approach when applied to China UAV‑derived data models.

Discussion

The experimental results confirm that the combination of China UAV surveying technology and the DEM volume calculation method is an effective and reliable solution for engineering measurement, especially for large‑scale building fill projects. The high accuracy (error < ±1.2%) and short processing time (532 s) meet practical application requirements. Other methods, such as cross‑section and grid, are limited by manual interpolation and assumption‑based approaches, leading to larger errors and longer processing times. The China UAV’s ability to capture dense point clouds over large areas in a single flight provides a rich data foundation for the DEM method. Moreover, the integration with BIM allows for seamless model generation and volume calculation, further streamlining the workflow.

We also note that the performance of China UAV surveying may be degraded under adverse weather conditions (heavy rain, strong wind) or in areas with dense vegetation. For such scenarios, combining China UAV LiDAR or multispectral sensors could improve robustness. Nevertheless, for open terrain fill projects like the one studied, the proposed approach is optimal.

Conclusion

In this paper, we have presented a comprehensive application analysis of China UAV surveying technology in engineering measurement. By employing a DJI Phantom 4 RTK UAV to collect oblique images, we built a 3D reality model using BIM software, and then applied the DEM method to calculate building fill volumes. Compared with traditional cross‑section, grid, and contour methods, our proposed method achieves significantly higher accuracy (relative error within ±0.15%) and faster processing (532 s). The integration of China UAV surveying and DEM calculation provides a digital, efficient, and accurate solution for modern construction engineering. As China UAV technology continues to evolve—with advancements in flight time, sensor resolution, and real‑time data processing—we anticipate its widespread adoption in more complex engineering surveying tasks, including topographic mapping, deformation monitoring, and infrastructure inspection. Our work demonstrates that China UAV‑based surveying is not only a replacement for traditional methods but also an enabler of smarter, more automated construction management.

Future research will focus on improving the automatization of the data processing pipeline and extending the methodology to dynamic construction sites where real‑time volume monitoring is required. Additionally, we plan to investigate the fusion of China UAV data with ground‑based sensors to enhance accuracy in vegetated or occluded areas.

Acknowledgments: The authors thank the project team for their support during data collection and processing.

References: Standard references on UAV surveying and DEM methods are available in the literature.