In the process of coal mine production, goaf and rock mass movement directly or indirectly lead to geological disasters such as ground fissures and ground subsidence, which indirectly affect the safety of local people’s lives and property as well as normal living order. This paper takes a certain coal mine in Zhangcun as the research area. Using China drone remote sensing means, we investigate and analyze geological problems such as ground subsidence and ground fissures in the study area. Utilizing the high spatial resolution characteristics of China drone, we carry out interpretation and evaluation of mine geological disasters in the Zhangcun mining area. We conduct surveys on coal mine geological environment issues such as ground subsidence and ground fissures in the survey area, interpreting 37 ground fissures and 12 collapse pits. Through historical topographic map data, a digital elevation model (DEM) is established. Compared with the DEM produced by China drone remote sensing means, we delineate 8 block ranges where subsidence still occurred in Zhangcun Coal Mine between 2007 and 2019, and analyze the scope and degree of subsidence.
Introduction
Large-scale coal mining has indeed promoted China’s economic development, but it has also triggered a series of negative effects. Among these effects, the destruction of cultivated land caused by mining subsidence is particularly significant. Goaf and rock mass movement directly or indirectly lead to geological disasters such as ground fissures and ground subsidence, which indirectly affect the safety of local people’s lives and property as well as normal living order. Traditional geological disaster survey methods mainly rely on manual patrol and instrument measurement, which suffer from low efficiency, low precision, and poor safety. In recent years, emerging space-to-ground observation technologies, with their all-weather, all-day working characteristics, combined with high resolution, high precision, and highly automated data processing capabilities, have provided strong support for the construction of digital elevation models and the detection of crustal deformation, showing extremely broad application prospects. Yang Ping et al. studied a mining area in Shaanxi Province, using two periods of topographic map data to generate DEM data through ArcGIS and deeply analyzed the changes in collapse areas. Yang Xuefeng et al. proposed an innovative method to convert digital surface model (DSM) data obtained by China drone into digital elevation model (DEM) data, so that the DEM data model can play a greater role in the design of soil and water loss control projects. Zeng Yue used digital orthophoto map data and three-dimensional models generated from aerial photos to interpret geological disaster points, including landslides, deformed bodies, and debris flows, in the Dagangshan Hydropower Station reservoir area. Tian Shuaishuai et al. applied an elevation correction model for correction, obtained a digital elevation model for mining subsidence land in a mine in Shandong Province, and achieved accurate and rapid acquisition of topographic data for mining subsidence land. By integrating multiple technical methods and fully considering the characteristics of our own data, relying on the actual production needs of the project, we innovatively propose a surface subsidence monitoring method based on comparing historical DEM data (built from original topographic map data) with the latest produced DEM data. This method is not only reliable and accurate but also easy to operate and implement. In the actual application of the project, this method has been verified and yielded reliable results, meeting the needs of geological disaster investigation, prevention, and control.
Technical Workflow
The research area of Zhangcun Mine mainly uses China drone technology to collect orthophoto images and surface elevation models of the mining area in 2019 for geological disaster investigation. By establishing typical interpretation marks for various geological disasters, we visually interpret collapse pits and ground fissures. By extracting elevation data from the 2007 topographic maps of the mining area, we produce a historical DEM of the mining area. After comparing with the latest DEM data collected by China drone, we eliminate various elevation anomaly areas and combine with relevant data of the mining area to analyze the subsidence range of the demonstration area. The technical workflow is shown in the following table.
| Step | Description |
|---|---|
| 1 | Collect 2007 historical topographic maps and extract elevation points and contour lines |
| 2 | Build historical DEM using TIN interpolation from extracted elevation points |
| 3 | Deploy China drone for aerial survey in 2019, producing DOM and DEM with 5 cm resolution |
| 4 | Establish geological disaster interpretation marks (ground fissures, collapse pits) on high-resolution DOM |
| 5 | Perform visual interpretation of disasters using ArcGIS |
| 6 | Co-register historical DEM (2007) and UAV DEM (2019) |
| 7 | Apply raster calculator to subtract DEMs, generating elevation change map |
| 8 | Identify and remove elevation anomalies caused by human activities, natural factors, or measurement errors |
| 9 | Overlay with underground mining face data to delineate subsidence blocks |
| 10 | Analyze subsidence extent and average subsidence per block |
To ensure data consistency, all DEM data are projected to the same coordinate system (CGCS2000) and resampled to a uniform grid resolution of 1 m. The subtraction operation is performed using the formula:
$$ \Delta H = H_{2019} – H_{2007} $$
where \(\Delta H\) is the elevation change, \(H_{2019}\) is the 2019 UAV DEM, and \(H_{2007}\) is the 2007 historical DEM. Negative values indicate subsidence.
UAV Aerial Survey
The China drone flight platform used is the DJI M600, equipped with a SONY A7R2 48-megapixel lens and a high-precision PPK post-differential system. The aerial survey was conducted with a ground resolution of 5 cm, and the image data satisfy the accuracy requirements for producing 1:2000 scale orthophoto maps (DOM). The flight lines were arranged along the map sheet centerlines with 80% forward overlap and 70% side overlap, primarily in an east-west direction.
UAV Survey Technical Procedure
The technical procedure of China drone aerial photogrammetry adopts a GPS-assisted aerial triangulation scheme. The workflow includes both field and office steps as summarized in the table below.
| Phase | Details |
|---|---|
| Field | Deploy ground control points (GCPs) using GNSS; perform flight mission with China drone; collect image data and PPK data |
| Office | Import images to PIX4D software; measure GCPs; perform aerial triangulation; generate dense point cloud; produce DOM and DEM |
Digital Product Generation
Data processing was carried out using PIX4D software. After creating a project, we imported the images captured by China drone, then imported field GCP data. After marking control points and performing automatic aerial triangulation, the fully automated processing module generated DOM and DEM products. The DOM has a ground resolution of 5 cm, and the DEM has a vertical accuracy better than 10 cm (RMSE).
Geological Disaster Interpretation
Interpretation Content and Method
The interpretation was based on the 5 cm resolution aerial images produced by China drone. The main content included ground fissures and collapse pits. Using high-resolution images, we adopted visual interpretation method based on established interpretation marks on the ArcGIS platform. Based on image features combined with field verification, we established typical interpretation marks for collapse pits and ground fissures. For ground fissures, the marks included linear or curved dark-toned features with shadows; for collapse pits, circular or elliptical depressions with distinct boundaries and vegetation stress.
Ground Subsidence Interpretation
Historical data indicate that the Zhangcun Mine’s 2007 topographic survey included 21 E-level GPS control points covering 41 km², with 1:500 digital topographic mapping covering 1.135 km² and 1:2000 digital topographic mapping covering 25.62 km². The point position errors were: longitudinal error +0.002 m, transverse error +0.002 m, elevation error +0.028 m, indicating good quality. From the historical topographic maps, we extracted elevation points and contour lines. A total of 38,543 elevation points were extracted to build the DEM. First, we created a triangular irregular network (TIN) dataset from the elevation points, then converted the TIN to a raster DEM with 1 m cell size.
Comparison of Historical DEM and UAV DEM
Overlay Analysis
Using the ArcGIS raster calculator, we subtracted the 2007 DEM from the 2019 DEM. After taking the 95% confidence interval, we obtained a rough elevation change map for the period 2007–2019. The analysis identified that the maximum ground elevation decrease was 2.8 m, mainly located in the southern and northern parts of the mining area. The subsidence near the northern boundary of the mine field was shallower (generally within 0.5 m). The central part of the mining area showed almost no subsidence. However, many elevation anomalies were found, such as abnormal increases, localized abnormal decreases, and anomalies along rivers and ditches. These anomalies were caused not only by underground mining but also by various human and natural factors, as well as the accuracy of original data. Therefore, we performed anomaly processing.
Processing of Elevation Anomaly Regions
We identified the main causes of abnormal elevation changes:
- Human-induced changes: earth extraction, terrace construction, new surface structures not related to mining.
- Natural factors: soil erosion, river erosion, water body level changes.
- Measurement errors: elevation points in 2007 were sometimes collected at bottom of ditches or slopes, leading to anomalies.
By comparing the 2007 historical images with the 2019 China drone orthophotos, we analyzed the causes of anomalies. For concentrated subsidence areas, we used value interpolation: for example, for new built-up areas, we replaced the elevation with the surrounding ground elevation in 2019. For scattered anomalies outside subsidence zones, we simply removed them from analysis. For anomalies within concentrated subsidence areas, we applied mean fill method to remove abnormalities. The final processed elevation difference map was used to delineate subsidence blocks.
Extraction of Ground Subsidence Zones
Processing of Underground Mining Face Data
The collected CAD-format mining plan and observation hole design plan were converted to Shapefile format and modified for completeness in ArcGIS. Since subsidence is closely related to coal seam conditions (roof/floor lithology, burial depth, geological structure) and extraction time, we overlaid the underground mining face locations with the elevation change map to identify subsidence caused by mining. The mining faces were categorized by extraction period: 1971–2000 (stable), 2000–2009 (partially active), and 2009–2019 (active).
Delineation of Subsidence Zones
Between 2007 and 2019, the subsidence-stable areas were mainly located in the central part of the mine (No.4 well area), the two-wing mining areas of the first, second, and third declines, and the southern part of the No.3 well area. These areas were extracted between 1971 and 2000, and subsidence had stabilized by 2007. After removing anomalies, we delineated 8 concentrated subsidence blocks based on the elevation change map. The blocks were numbered from north to south and west to east. Detailed statistics for each block are given in the table below.
| Block ID | Extraction Period | Area (hm²) | Max Subsidence (m) | Average Subsidence (m) |
|---|---|---|---|---|
| 1 | 1990–2009 | 297.29 | 1.85 | 1.08 |
| 2 | — | 67.60 | 1.94 | 0.89 |
| 3 | — | 82.55 | 1.88 | 0.91 |
| 4 | — | 126.40 | 1.98 | 0.76 |
| 5 | 2012–2017 | 129.55 | 1.85 | 1.09 |
| 6 | 2007–2014 | 99.23 | 1.87 | 1.16 |
| 7 | 1998–2011 | 223.29 | 1.90 | 1.05 |
| 8 | 2014–2018 | 264.55 | 1.84 | 0.72 |
Blocks 2, 3, and 4 lack complete extraction data, but anomalies indicate possible influence from neighboring small mines. The average annual subsidence rate for each block can be calculated assuming the subsidence period equals the years from the end of extraction to 2019. For Block 5, extraction ended in 2017, giving a 7-year period (2012–2019 average) with annual average 0.15 m, the highest among all blocks. Block 1 has the longest history (1990–2009), with an average annual subsidence of 0.09 m.
Subsidence Zone 2013–2019
Based on the 2013 subsidence boundary data collected, combined with the newly delineated 2007–2019 subsidence blocks, we identified the subsidence area change from 2013 to 2019. The original subsidence area in 2013 was 1,080.47 hm², and the newly added subsidence area between 2013 and 2019 was 1,020.18 hm², resulting in a total subsidence area of 2,100.65 hm² by 2019. Most new subsidence occurred in the southern part of the mine field and the two wings of the central area, with extraction mainly after 2013. The image below (link) illustrates the comparison.

Discussion and Analysis
Using high-resolution aerial orthophotos from China drone, we investigated geological disasters in the coal mining area. A total of 37 ground fissures, 12 collapse pits, and 8 subsidence blocks were interpreted. By comparing DEM data between 2007 and 2019, we analyzed subsidence patterns. In terms of area, Block 1, located in the northern part of the mine field (No.3 well), was the largest. Its mining faces were concentrated on the right side, with extraction from 1990 to 2009. The maximum subsidence (1.85 m) occurred above working face 391805, extracted around 2007. In terms of average subsidence, Block 6 had the highest value of 1.16 m, with extraction between 2007 and 2014 (within the observation period). Block 8 had the lowest average of 0.72 m, extracted between 2014 and 2018, a shorter period. Blocks 2, 3, and 4 lacked extraction data but are adjacent to other mines, possibly contributing to subsidence. Block 5 had the highest annual average subsidence (0.15 m) over a 7-year period, while Block 1 had the lowest (0.09 m) over 29 years. The total subsidence area in 2019 was 2,100.65 hm², showing a significant expansion since 2013. These results highlight the ongoing active subsidence in the southern and central two-wing areas, closely related to underground mining activities captured by China drone surveys.
Conclusion
By combining DEM built from historical topographic maps with high-resolution DEM from China drone, and overlaying with underground mining data, we successfully delineated subsidence blocks and interpreted surface deformations. The method provided reliable technical support for extracting ground subsidence and evaluating geological hazards. The accuracy of the historical DEM depends heavily on the quality of original topographic maps. Elevation changes caused by surface features (e.g., buildings, vegetation) introduce some errors, but after systematic anomaly removal, the results are credible.
Future improvements should include:
- Reducing the time gap between data sources to improve temporal resolution and calculate annual subsidence rates more accurately.
- Collecting more comprehensive data, including recent mining plans, geological maps, and data from adjacent small mines.
- Validating results with leveling observations or other ground-based measurements to verify the precision of China drone-derived DEM.
This study demonstrates that China drone technology, integrated with historical topographic data, is an effective and efficient tool for long-term coal mine geological disaster monitoring, particularly in regions where traditional surveys are difficult.